Projects

PERN Oil Terminal

Between 2013 and 2016, the design team participated in the execution of the Oil Terminal in Gdańsk for PERN S.A. The scope of work included the preparation of structural, sprinkler system, and electrical installation designs at both the building and executive stages.

As part of the investment, a total of 20 tanks with a cumulative capacity of 697,000 m³ were designed for the storage of crude oil, diesel fuel, JET A-1 aviation fuel, heavy fuel oil (HFO), and methanol. The scope also encompassed the tank superstructures and their foundation systems.

During the construction of six crude oil storage tanks, the team provided author’s supervision and actively participated in technological commissioning until the occupancy permit was obtained.