Projects

Oil Terminal Expansion – Phase II

As part of a consortium with PGNiG GAZOPROJEKT S.A., we developed comprehensive multi-disciplinary design documentation for Phase II of the Oil Terminal expansion in Gdańsk. The investment encompassed five above-ground crude oil storage tanks with a total capacity of 390,000 m³, along with pipelines, technical, road, fire protection, electrical, and telecommunications infrastructure.

The scope of work included executive and technological designs, HAZOP analysis, technical inspection documentation for TDT (Transportation Technical Supervision) and UDT (Office of Technical Inspection), commissioning design, as-built documentation, and author’s supervision.